Corporate News
View AllA meeting takes place of the technical subcommittees regarding blocks 112 and 129-132 of the continental shelf of Vietnam
The regular meeting of the technical sub-committees took place in Da Lat (Vietnam) on 12-15 December on the opening up of blocks 112 and 129-132 on the continental shelf of the SRV.
At the meetings, the schedule for exploration and measuring the volume of reserves at the Bao Vang) field (block 112) was discussed. The issue of the documents required for preparation of the development of the fields discovered by Vietgazprom, was also addressed, as well as a diagram of their development.
In addition, participants discussed the results of marine electro-prospecting studies in the current year on blocks 129-132, and the results of the general conclusions from the geological and geophysical information and study of the geological structure of the licensed areas.
Representatives from JSC Gazprom, PVN PetroVietnam, Gazprom International, PVEP, VPI, CRS Vietgazprom, RSU Gubkin Oil-and-Gas and JSC TyumenNIIgiprogaz all took part in the sub-committee work.
Nike Jordan